  • 1. There were insulation problems in the line. Because the original Z-bar is made out of steel it becomes very hot.
  • 2. The energy is not just running between the welding wheels, but also over the Z-bar. This causes the welding process to become unstable.
  • 1. At the location of the customer, we removed the existing Z-bar and made the measurement needed to reengineer the part.
  • 2. We chose to use insulation material that insulates well and can stand the high volume (low wearing).
  • 3. Engineered and built the new Z-bar and build it in at the Mechatronic drumwelder.

快乐彩票网上平台

快乐彩票网上平台

单机棋牌游戏免费下载  此外,9月,大通證券因對員工開立證券賬戶情況缺乏有效監控,被責令改正  在2019年,程維兩次出現在《新聞聯播》,也是發生在1月和10月

  • 1. The hourglass section on an existing drum welder needed to be replaced.
  • 2. There were insulation problems and the shape of the hourglass was not in order. This caused the overlap to become unstable.
  • 1. We engineered a new hourglass section complete on frame.
  • 2. Changing was easy removing the old frame by removing 8 bolts and place the new frame by mounting 8 bolts, 2 pneumatic hoses and 1 electrical connector.

快乐彩票网上平台

illustration Process

大赢家足球310即时比分短視頻以人均單日110分鐘的使用時長超越即時通訊,短視頻平臺也隨之成為旅游出行決策的入口  以傳統跟團游為主要業務的旅行社企業今年將面臨大震蕩

快乐彩票网上平台

  • 1. The process starts with an inquiry from the customer.
  • 2. MeltingTogether reviews the inquiry and if needed asks for additional information. For example:
    • a. Drawings
    • b. Specification of requirements (mechanical, electrical, pneumatic, cooling, etc.)
    • c. What is the reason for changing the part (preventive, problem, innovation, etc.)?
  • 3. MeltingTogether offers a price for inspection on site (if needed).
  • 4. Melting Together provide inspection on site (if needed).
  • 5. MeltingTogether offers a budgetprice for new engineering.
  • 6. If price for new engineering is agreed customers sends a order to MeltingTogether
  • 7. Engineering starts.
  • 8. When engineering is completed MeltingTogether presents it to the customer.
  • 9. Customer is able to give his comments.
  • 10. If MeltingTogether and customer agree on comments of customer they are worked out in the engineering. Step 8 will follow.
  • 11. When the engineering is final, MeltingTogether offers a price for making the product.

快乐彩票网上平台

  • 1. The making of the compenents start with an order according to the offer based on final engineering.
  • 2. The product or compenents are made.
  • 3. If there are more compenents the product is build together by MeltingTogether.
  • 4. Documentation
  • 5. Testing the part or the machine according to our test report or agreed testing procedure. The following tests are carried out:
    • a. Visual inspection
    • d. Functional test